Stucco and Ramp Update

The entrance ramp project has been completed and the Stucco is nearly done as well.  Not much to say about it, other than the fact that all of our contractors are doing some great work for us. Here are some pictures of the finished ramp and the stucco progress:

t

The concrete pad for the garbage cans is smoothed out.

t

The finished project, drying.

t

The crew works on the Glenhurst entrance concrete. This is the replacement for the existing section that was demolished because of the tripping hazard.

t

The finished concrete work, as seen from inside the church.

t

The finished project from outside the church. Notice the new ramp on the far side of the brick column.

t

A closeup up the new wheelchair accessible ramp. There will be railings installed on the side of the ramp nearest the brick column, wrapping around the column.

t

A wide shot of the front of the worship center stucco repair. The two brighter columns are complete. The remaining await a final coat of stucco.

t

A close-up of the stucco work.

Post to Twitter Post to Delicious Post to Facebook


One Response to “Stucco and Ramp Update”

  • Debbie Says:

    I finally read through “The Lord Builds”  blog and am so impressed. Thanks Jason for a great job in chronicling the plans and projects at church. The photos are great. I enjoyed reading back from the beginning.

Leave a Reply