Ramping Up

You read about how we decided on a ramp into the church at the Glenhurst entrance over at the Evolution of an Idea post. At the time, we also posted a photoshopped image of what the entrance would look like. Well, we’re done with the ramp piece and just awaiting the final handrails.  Check it out:

t

The finished ramp, without any blacktop work being done.

t

Asphalt being shaped to eliminate the step up to the ramp.

t

The finished ramp. We'll be adding some yellow paint to mark the edges of the asphalt to avoid tripping on the edge.

We’ve also finished the garbage pad:

t

The finished pad for the garbage totes.

t

The new home for the totes. This allows us better access to the totes without getting muddy during the rainy seasons.

Post to Twitter Post to Delicious Post to Facebook


Leave a Reply