Most finishing failures lippage, hollow tiles, peeling paint, creaking boards come from preparation, not product. We spend the time on substrates, moisture and setting out that makes the finish last.
Tile layouts are planned around sightlines so cuts land where nobody looks. Paintwork is cut in by hand. Flooring is acclimatised and laid with the right expansion allowance.